<tr id="tnogj"><track id="tnogj"></track></tr>
  • <output id="tnogj"></output>

    <ins id="tnogj"><video id="tnogj"><var id="tnogj"></var></video></ins>

  • <tr id="tnogj"><small id="tnogj"></small></tr>
    <ruby id="tnogj"><option id="tnogj"><del id="tnogj"></del></option></ruby>

    <noscript id="tnogj"></noscript>

    1. <ins id="tnogj"><video id="tnogj"><optgroup id="tnogj"></optgroup></video></ins>
      1. <tr id="tnogj"></tr>
        <noframes id="tnogj"><small id="tnogj"></small></noframes>

          <code id="tnogj"></code>

            <code id="tnogj"></code>
            <sup id="tnogj"><small id="tnogj"></small></sup>

            1. <ins id="tnogj"><acronym id="tnogj"></acronym></ins>

                  <kbd id="tnogj"><video id="tnogj"></video></kbd>
                  聯系我們
                  聯系人:xx
                  轉讓電話:13313028229
                  地址:xx
                  新聞動態
                  現澆混凝土樓板裂縫的處理
                  1. 正確觀察裂縫寬度;
                  1. correctly observe the width of the crack.
                  2. 基層處理:清除裂縫表面的灰塵,油污;
                  2. grass-roots treatment: remove dirt and oil from cracks;
                  3. 確定注入口:一般按20~30cm距離設置設一個注入口,注入口位置盡量設置在裂縫較寬,開口較通暢的部位,貼上膠帶,預留;
                  3. determine the injection port: in general, an injection port is set up at the distance of 20 to 30cm, and the position of the injecting mouth is set as wide as the crack is wide, the opening is more smooth, tape is attached and reserved.
                  4. 封閉裂縫:采用午晟智造?快干型封縫膠,沿裂縫表面涂刮,留出注入口;
                  4. closed cracks: use Wu Sheng Zhi to create quick drying sealant, scraping along the surface of cracks, leaving the injection port.
                  5. 安設塑料底座:揭去注入口上膠帶,用封縫膠將底座粘于注入口上;
                  5. install the plastic base: remove the adhesive tape on the injection port, and use the sealant to stick the base to the injection port.
                  6.安設灌漿器:將配好的灌漿樹脂注入軟管中,把裝有樹脂的灌漿器旋緊于底座上;
                  6. install the grouting device: pour the filling resin into the hose and tighten the resin grout on the base.
                  7.灌漿:松開灌漿器彈簧,確認注入狀態,如樹脂不足可補充再繼續注入;
                  7. grouting: loosen the grout spring, confirm the injection state, such as insufficient resin can be added to continue injection;
                  8.注入完閉:待注入速度降低確認不再進膠后,可拆除灌漿器,用堵頭將底座堵死;
                  8. injecting and closing: after the injection speed is lowered, no grouting is confirmed, the grouting device can be dismantled and the base is blocked by plugs.
                  9.樹脂固化后敲掉底座及堵頭,清理表面封逢膠。
                  9. after curing the resin, knock off the base and plug, clean the surface sealing glue.

                  北京鼎锘恒潤建筑裝飾有限公司

                  1. 電話:13313028229
                  2. 網址:www.www.jiamusidaxue.com

                  版權北京建筑裝飾有限公司 網址:www.www.jiamusidaxue.com 推薦:北京鋼結構加建閣樓制作,北京別墅加建改造公司,北京現澆混泥土澆筑公司,北京路面切割修復公司,北京樓頂防水堵漏公司,北京陽光房制作公司,北京混泥土切割拆除加固,北京現澆混凝土樓板制作公司,北京現澆樓梯公司

                   

                  狠狠综合久久久久精品网站